USCG Cutter Neah Bay haulted out at Great Lakes Shipyard

by Hans | May 14th, 2013

Great Lakes Shipyard hauled out the United States Coast Guard Cutter NEAH BAY (WTGB-105) using its 770-ton capacity Travelift.

The repair contract, awarded to the Shipyard in early March, includes routine drydocking and underwater hull maintenance such as inspection and testing of propulsion systems; overhaul of sea valves and shaft seal assemblies; and other various cleaning, inspections, and repairs.

This is the first of the USCG’s nine (9) 140-foot Bay Class ice breaking tugs to be drydocked using Great Lakes Shipyard’s new Marine Travelift. The Travelift is the largest on the Great Lakes in the United States and Canada, second largest in the Western Hemisphere, and third largest in the world.  It was specifically designed and sized for Great Lakes Shipyard to accommodate the Bay Class Coast Guard Cutters and other vessels.

Work on the NEAH BAY is to be completed by late June.

Great Lakes Shipyard is a full-service yard specializing in new construction, fabrication, and repairs of all types of vessels and barges.

To learn more, visit www.thegreatlakesgroup.com

Related Posts:

Leave a Reply

Sanmar Denizcilik A.?
Astilleros Armon
DMT MARINE EQUIPMENT
Van Wijngaarden Marine Services B.V.
Sea Conquest Marine Surveys & Consultancy
W.K.M. Cornelisse Trading B.V.
Robert Allan Ltd
Transport & Offshore Services
Damen Shipyard Group
Alphatron Marine
Bogazici Shipping