First Crane/workboat successfully delivered to KOC

by Hans | December 21st, 2014

Grandweld shipyards successfully delivered the first Crane/Workboat for Kuwait Oil Company (KOC) on the 15th December 2014. The contract was signed in February 2013 to design and build a series of four heavy-duty Crane / Workboat class vessels to meet the specific needs of KOC.
The vessels were designed by Grandweld and model tested before starting production. The vessels are designed for unrestricted duties and for tasks such as lifting and moving heavy equipment, oil-pollution control, SPM hose handling, FO/FW supply to remote areas, and other similar duties. These vessels are powered by 2 x 1068KW medium speed  main engines driving Azimuthing Stern Thrusters with Controllable Pitch Propellers. The engines are supported by Condition Based Monitoring System to monitor the engines and propulsion system through satellite. Each vessel is equipped with a crane in the forward area of the vessel capable of lifting 20 tons at 10 meters radius. The vessel is also fitted with a bow thruster  to enhance the vessel’s maneuverability. The vessel achieved bollard pull of more than 35 tons and speed of more than 11.9 knots during sea trials much above its contractual requirement.

Related Posts:

Leave a Reply

Robert Allan Ltd
W.K.M. Cornelisse Trading B.V.
Alphatron Marine
Bogazici Shipping
Sanmar Denizcilik A.?
Sea Conquest Marine Surveys & Consultancy
Transport & Offshore Services
Astilleros Armon
DMT MARINE EQUIPMENT
Damen Shipyard Group
Van Wijngaarden Marine Services B.V.